Why should a professional do liner installation?

Placing a liner is an extremely demanding job, which requires expertise, knowledge and experience during work. The screed, or leveling layer, is a necessary layer during the construction of the floor, which levels the concrete base and serves as a base for setting the final layer. After placing the liner, leveling follows, which ensures a completely flat and smooth surface. As this work requires special tools and professional knowledge, it is best to hire craftsmen or a company that deals with this work.

What should be considered when installing the liner?

Placement of linerPlacement of liner To install the liner, you need to determine which thickness is best for your needs. The optimal thickness of the liner is 5 cm. After pouring the screed, speed is required when leveling, because otherwise water pockets may form that remain in the screed and significantly reduce its quality. After placing the screed, there is a drying time. The liner must be constantly moistened and watered, a few days after installation, so that cracking does not occur later.

What are the benefits of lining?

Placing the screed results in a flat and smooth floor, which is an ideal surface for floor coverings. You can also install underfloor heating under the screed. In addition, sound and heat insulation is obtained by installing the liner.

What needs to be done before placing the liner?

When you need to install the liner, you should remove all furniture, decorations and other items from the room where you want to install the liner. In this way, you will create space to work and also protect the furniture from dirt. It is also necessary to protect the walls and place stops on the edges, i.e. ribbons. That way you will get a straight line when removing the strips.

What is needed to install the liner?

To install the screed you will need a cement mixer, a shovel, a leveling rod and a float. Pay attention to the packaging when mixing the liner. It is very important to pay attention to the density of the mixture.

How long does it take to pour the cement screed?

One day is enough for just installing the liner. However, if you take into account the preparation as well as the drying time, you will need 2 to 3 days.

How much does it cost to install a liner?

The price depends on the surface on which the liner is installed. It would be best to post a job announcement on the Bellcom.rs portal and wait until you receive offers from several companies or craftsmen. Pay attention to the experiences of other people with these masters.

Register, describe the job. Your request is immediately sent to the correct craftsman. Compare the offers and choose the best one.
- Completely free for clients / employers.
- Completely free for companies/contractors.
- Completely free information about a new job.
- Completely free information about the selected offer.