Services

Concrete the floor

Why should concreting the floor be left to an expert?

When is it necessary to concrete the floor? In the past, earth, gravel or slag was used to make the floor. This is a very common case in old houses that do not have a classic foundation but a foundation made of bricks and filled with these materials. These types of floors are usually uneven because they settle over time, but dampness is also common. If you want to concrete the floor, you need to remove the old wet layers of material first. You can do concreting yourself, but this also requires physical labor, so it is best to hire experts who have tools and machines, but also enough people to do this work.

What should you pay attention to when concreting the floor?

Do you want to concrete the floor? It is necessary to make preparations. Make sure that all your materials and tools are in one place and ready to go. Also, depending on the purpose of the room where the floor is concreted, it is necessary to determine the thickness of the concrete. The usual thickness of concrete is about 10 cm. It all depends on the purposes for which the concrete will be used. Also, for concreting, it is necessary to make a firm and stable base. It is best to hire experts for this job, because that way you will save yourself the hassle of organization and planning, but also save your precious time.

What preparations should be made for concreting the floor?

For concreting the floor, it is necessary to prepare the ground well. A floor that is not properly compacted before the concrete is poured can later cause the concrete to crack and settle. This can cause bumps and cracks. Any unevenness can cause a problem later when the final floor coverings are installed. You can also put reinforcement, so that the concrete is stronger and lasts longer. In any case, it is best to seek expert advice or hire a concrete pouring company.

What are the advantages of concreting the floor?

Concrete the floorConcrete the floor Concrete floor has many advantages. Floors made of earth or slag and sand are more likely to create moisture and mold. Concreting also gives you a flat surface that will be ready for future floor coverings.

What material and tools are needed for concreting the floor?

From the materials you will need cement, water, gravel. From tools shovels, wheelbarrows, mixers. When mixing the concrete, it is important to make sure that it is not too runny or too thick, as this is the only way to achieve a good result.

How long does it take to concretize the floor?

The time varies depending on the size and depth of the area to be filled. Also, it takes time for the concrete to dry. If floor insulation or underfloor heating is also installed, it may take additional time.

How much does concrete batching cost?

Costs depend on the area of u200bu200bsoil to be filled. A larger area requires more material and time, which increases the cost of concreting the floor. It”s best to get multiple quotes before making a decision

Register, describe the job. Your request is immediately sent to the correct craftsman. Compare the offers and choose the best one.
- Completely free for clients / employers.
- Completely free for companies/contractors.
- Completely free information about a new job.
- Completely free information about the selected offer.