Is it necessary to hire an expert for kitchen installation?
Kitchen assembly does not only refer to the assembly of kitchen parts, but also the connection of all devices and appliances. It is also necessary to connect all water pipes and sewerage, as well as electrical installations, in the kitchen. Professional knowledge is required for these jobs. That”s why it”s best to hire a company that has all the necessary craftsmen to ensure that everything in your kitchen is assembled and installed according to the rules.
What should be taken into account when installing a kitchen?
Assembling the kitchen requires, first of all, flat walls on which the kitchen parts can be placed without any problems. Uneven walls can be a problem during assembly, as your parts will not sit flush. In such situations, the assembly of parts can take a lot of time. If you leave this job to the masters, you will save your time and you will be sure that the job will be done properly.
What preparations need to be made before assembling the kitchen?
The assembly of the kitchen and of course the kitchen itself must be well planned. Therefore, you need to know in advance how much space you will need and where you want to place the cabinets, sink, stove, refrigerator, dishwasher and other parts of your kitchen. You can seek advice from masters and experts who will suggest what can be done, what can and cannot be connected and where costs can be saved.
What tools and materials do you need to assemble the kitchen?
Assembly of the kitchen In addition to chipboard or wood for making parts, you will also need screws, dowels, silicone. It is best to seek advice from specialized stores. They will also give you advice on which materials are more durable and of better quality. The tools you should have on hand are a tape measure, a drill, a screwdriver, a rubber hammer, a spirit level, as well as a special tool for plumbing and electrical installations.
How long does it take to assemble the kitchen?
How long it will take you to install the kitchen depends mainly on the number of people who are assembling your kitchen. At least two people need to do the assembly work for everything to work properly. It will also be necessary to bring in and set up heavy pieces of furniture or, for example, a washing machine or a refrigerator. Of course, it also depends on the size and complexity of the kitchen. In general, installation should not take more than a day, at best only a few hours.
How much does it cost to install a kitchen?
The price of installing a kitchen can vary, depending on how many parts there are in the kitchen that need to be installed, as well as how many devices need to be connected. It is best to agree on a price for the entire job with the company or craftsman. In that case, they will take care of all the necessary work.
